Pre-delivery inspection: get exactly what you paid for.
Before you sign off on your new condo or villa, a civil engineer inspects it for you: visible structure, moisture, systems, finishes and what your contract says.
- Report within 72 hours
Before you take possession
Who it's for
Anyone about to take possession of a new property in Punta Cana, Bávaro or Cap Cana — especially if you can't be there in person or don't have construction experience.
Once you sign the handover, claiming defects is usually harder. Inspecting first — as engineers, not salespeople — gives you a concrete punch list of what needs fixing.
What we inspect
Cracks and moisture
Visible condition of walls, ceilings and slabs; stains, leaks and signs of moisture.
Systems
Electrical, plumbing, drainage and A/C: that they work and are properly finished.
Finishes
Paint, tile, doors, windows, carpentry and levels.
Plans and contract
We compare the promised areas, layout and materials with what's delivered.
Photo report
Every finding with a photo, location and clear explanation.
Delivered within 72 hours
So you can request fixes before you sign.
Pre-delivery inspection
How it works
Tell us your handover date
And share your plans and contract, if you have them.
We arrange access
With the developer or your representative.
We inspect the unit
A full technical review, room by room.
You get the punch list
With photos, within 72 hours, ready to send to the developer.
Common questions
Frequently asked questions
Do I need to be there?
No. Many of our clients live abroad; we arrange access and send you everything documented.
What do I do with the report?
Send it to the developer so they fix the findings before handover. If you'd like, we can come back to verify the fixes.
Do you need the plans and contract?
It's not required, but it helps a lot: we can compare what was promised with what was delivered, not just look for defects.
Do you inspect villas and houses too?
Yes — condos, villas and houses in Punta Cana, Bávaro, Cap Cana and nearby areas.
When should I book it?
Ideally a few days before the handover date, so there's time for fixes.
Let's talk
Don't sign the handover without an inspection.
Tell us your handover date and we'll schedule the inspection.